Composite Bridge acc. EN 1994-2

Composite Bridge acc. EN 1994-2

Course modified date: 7 March 2026
  • Language: English
  • Level: Intermediate
  • Length: 3 hours
  • Platform: AutoCAD
  • Application: SSD
  • Version: 2026

This tutorial will introduce you to the workflow of designing a composite bridge using SOFiSTiK FEA 2026.

The focus lies on performing the key design checks for composite bridges in accordance with EN 1994-2.

  • Teacher: Guido Altersberger
  • Enrolled students: There are no students enrolled in this course.